JHP prepared a master plan and development framework for a greenfield site within the Craig Ranch development in McKinney, Texas. The planning team collaborated with the City of McKinney to finalize the plan and secure a Planned Development (PD) governing all future development on the site. The concept is based on urban-scaled streets and public spaces organized around a central active open space, creating a walkable residential village that connects seamlessly to the larger Craig Ranch area and supports future growth.

Client:

Columbus Realty Partners

Location:

McKinney, TX

Project Data:

  • 2000 units
  • 41.31 acres
  • 48.4 units per acre

Click highlighted areas to explore projects


Challenge

Within the larger Craig Ranch development in McKinney, Texas, the 41.31-acre site required a clear organizing vision to guide future growth. The challenge was to balance the surrounding suburban context with a more urban, walkable residential character while coordinating land use, circulation, and open space in alignment with City standards.

Solution

JHP prepared a comprehensive master plan and development framework in close collaboration with the City of McKinney. The plan organizes an inward-focused residential village centered on a four-acre active open space, with urban-scaled streets, sidewalks, and a connected roadway network that integrate seamlessly with the broader Craig Ranch area.

Impact

The master plan establishes a cohesive, walkable district that strengthens Craig Ranch’s urban character while remaining flexible over time. By prioritizing connected streets, active open space, and human-scaled infrastructure, the framework supports sustainable growth and creates a strong sense of place that can adapt as development evolves.

Triangle

Featured Projects

Related Projects

JHP
Close

Dallas

214-363-5687
8340 Meadow Road, Suite 150
Dallas, Texas 75231-3766

Denver

303-381-2776
2535 17th Street, Suite E
Denver, Colorado 80211